Schedule of Charges

All charges for Infobd24 Systems services are mentioned here which are not included with the internet packages.

S/L
Particular
Charge (৳)
1
One Time Setup Charge (OTC) For New Connection
1500
   1.1
Upto 100 Meter Optical Fiber Cable, ONU, Patchcord
   1.2
TJ Box & UTP CAT-5 Short Cable (Max. 3 Meter)
2
Address Shift (Extra Cable and Device Not Included)
   2.1
Connection Area /Zone Change
500-800
   2.2
Floor Chage /Cable Direction Change
300-500
3
Ownership Change at Same Address
200
4
Ownership Change & Address Shift
700-1200
5
Basic Wireless /Wifi Router Configuration Charge
300
6
Mikrotik Router Basic Configuration
500-2000
7
UTP Cable Connector Change (1 or 2 Connector)
60
8
ONU Power Adapter Replace
250
9
Fiber Patch cord Replace (For Client end TJ Box)
300
10
Additional Product
   10.1
4 Core Optical Fiber (Per Meter)
20
   10.2
2 Core Optical Fiber (Per Meter)
15
   10.3
UTP CAT-6 Cable (Per Meter)
30
   10.4
UTP CAT-5 Cable (Per Meter)
15
   10.5
RJ-45 CAT-5 Connector (Per Piece)
10
   10.6
RJ-45 CAT-6 Connector (Per Piece)
15

Get a quote

We’d love to hear from you. Drop us a line.